State:

Community:
Metro   City


Elite Pools

Thank You! Your rating has been saved.

Elite Pools is one of the top custom pool builders in the Mid-Atlantic, specializing in concrete inground pool installation.

If you are ready to schedule your pool installation in Maryland or the surrounding area, or would like more information on in-ground pools or other pool maintenance, then you've come to the right place.

Choose from a variety of styles:

Vanishing Edge Pools

Free Form Pools

Interactive Play Pool Features, Such as Water Slides

Water Features and Rocks

Walk-in Pools

Lap Pools

Diving Pools

Spas

Building Your Pool

STEP 1 - PRE-PROCESSING

All of the plans and legal documents are checked and verified. The pre-site and engineering equipment/products are ordered.

STEP 2 - PERMITTING

Your permit is prepared and submitted to your county. The time this takes will vary depending on the city/county.

STEP 3 - VIRTUAL REALITY DESIGN

The crew will put all of your information into the computer and work on creating your own virtual reality oasis. This also allows for all of the information such as measurements/ last-minute design changes to be seen by the crew.

STEP 4 - FINAL PROCESSING

This is where all of the pre-grade is ordered and if there is anything that is already in the backyard would be removed to start renovating and digging.

STEP 5 - LAYOUT

On your property, Elite Pools will put a painted layout of exactly where your pool will go.

STEP 6 - EXCAVATION

This is where things might get dirty! The excavator arrives and digs up the dirt where your new pool will be.

STEP 7 - EQUIPMENT AND PLUMBING

Your pool equipment and plumbing will be installed at this point.

STEP 8 - STEEL

After Phase 7, steel rebar with spacers are installed to create the structure for your pool.

STEP 9 - ELECTRIC

The electric wiring is then installed with all the necessary precautions.

STEP 10 - PRE-GUNITE INSPECTION

Before we can progress to the next stage, a city inspection is scheduled.

STEP 11 - SHOTCRETE

Once the inspection is passed, concrete is installed to the pool's interior.

STEP 12 - WATERFALL AND BOULDERS

If the pool owner wants, waterfalls and boulders would be added at this time.

STEP 13 - DECKING AND PAVERS

At this time, decking and pavers can be installed.

STEP 14 - TILE

Waterline tile is installed now.

STEP 15 - CLEAN UP

The debris all in your backyard will be cleaned up and looking brand new with a new pool.

STEP 16 - FENCING

Fencing will be put around your yard if desired.

STEP 17 - ACRYLIC (IF DESIRED)

If your pool's design is applicable, acrylic material will be added to the decking, allowing 24 hours to cure.

STEP 18 - PRE-PLASTER INSPECTION

In order to ensure that all barrier requirements are completed, a city inspection needs to happen with you, the homeowner, to be present.



Explore Related Categories


Details and Specs

Hours of Operation:
 OpenClosed
Mon8:00 AM5:30 PM
Tue8:00 AM5:30 PM
Wed8:00 AM5:00 PM
Thr8:00 AM5:30 PM
Fri8:00 AM5:30 PM
Sat8:00 AM5:30 PM
SunClosed 
Business Size: 1-10
Notes: None Listed

Reviews

Be the first to add a review for this item.


Please write a review for this item

Send a Message

News

There are currently no articles available.